Historical method: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Administrator (CSV import) |
imported>Doug Williamson (Expand definition.) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
In Value at risk analysis, a simplified variation of the Historical simulation method. | In Value at risk analysis, the historical method is a simplified variation of the Historical simulation method. | ||
For all practical purposes, the historical simulation method is to be preferred. | For all practical purposes, the historical simulation method is to be preferred. | ||
== See also == | == See also == | ||
* [[Historical simulation method]] | * [[Historical simulation method]] | ||
* [[Value at risk]] | * [[Value at risk]] | ||
[[Category:Risk_frameworks]] |
Latest revision as of 17:03, 24 December 2019
In Value at risk analysis, the historical method is a simplified variation of the Historical simulation method.
For all practical purposes, the historical simulation method is to be preferred.