Historical method: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Doug Williamson m (Category added 9/10/13) |
imported>Doug Williamson (Expand definition.) |
||
Line 1: | Line 1: | ||
In Value at risk analysis, a simplified variation of the Historical simulation method. | In Value at risk analysis, the historical method is a simplified variation of the Historical simulation method. | ||
For all practical purposes, the historical simulation method is to be preferred. | For all practical purposes, the historical simulation method is to be preferred. |
Latest revision as of 17:03, 24 December 2019
In Value at risk analysis, the historical method is a simplified variation of the Historical simulation method.
For all practical purposes, the historical simulation method is to be preferred.