Historical method: Difference between revisions
From ACT Wiki
Jump to navigationJump to search
imported>Administrator (CSV import) |
imported>Doug Williamson m (Category added 9/10/13) |
||
Line 2: | Line 2: | ||
For all practical purposes, the historical simulation method is to be preferred. | For all practical purposes, the historical simulation method is to be preferred. | ||
== See also == | == See also == | ||
* [[Historical simulation method]] | * [[Historical simulation method]] | ||
* [[Value at risk]] | * [[Value at risk]] | ||
[[Category:Risk_frameworks]] |
Revision as of 14:14, 9 October 2013
In Value at risk analysis, a simplified variation of the Historical simulation method.
For all practical purposes, the historical simulation method is to be preferred.